RG Carter, having previously pumped the bases on the first phase. On the day of the pour shown above, we supplied a 2013 Putzmeister M42 mobile concrete pump with a 2012 Schwing M36 mobile concrete pump. They pumped over 300 cu metres of concrete into the turbine base. There are now four wind turbines on the site at the old Eye Airfield in Suffolk, supplying power to the Roy Humphrey Group, other businesses on the Eye Airfield Industrial Estate and local residents.