When Main Contractor Farrans Construction needed to pour over 600m3 of concrete into the Cofferdam Base, for Pier 5 on the Gull Wing Bridge project at Lowestoft, Suffolk, there was only one supplier to call. Camfaud supplied 2 identical 65m mobile concrete pumps to ensure full coverage of the pour from both pump locations. Another well planned and perfectly executed pour from the UK’s leading mobile pump supplier.
2 x 65m Schwing mobile concrete pumps with a 63m Putzmeister mobile concrete pump on standby.